Masovian, Poland

Siedlce Greenvolt BESS

ESS / storageDevelopmentOwner exit

Capacity

600 MW / 2400 MWh

COD target

End-2027 (COD target)

Pricing

On enquiry

Chemistry

Not published (BYD Energy Storage supply)

Interconnection

PSE (voltage not published) · 50 Hz

One form — we email the desk and confirm to you.

600 MW / 2.4 GWh standalone BESS at Siedlce, Poland. Construction underway; COD targeted end-2027. Greenvolt Power public print — not EnergyInfra-owned.

Location. Siedlce, Masovian Voivodeship, Poland.

Grid. Standalone BESS, PSE / Polish grid. Construction started (public reports Sep 2026). BYD Energy Storage supply; P&Q and ONDE on electrical / EPC support.

Connection. Greenvolt Power — 600 MW / 2.4 GWh at Siedlce. Would be Poland’s largest BESS once complete. Builds on Ełk and Turośń (together the three assets would reach 1 GW / 4 GWh). Asking price not published.

Offtake. Not disclosed in the public source.

Public source. REGlobal / ESS-News, September 2026 (Greenvolt Siedlce construction). Compiled from a public announcement or listing — not an EnergyInfra-owned asset and not a CIM. https://reglobal.org/greenvolt-power-begins-construction-on-2-4-gwh-bess-in-poland/

Request this file