Hertfordshire, United Kingdom

Longfield Solar Energy Farm

Solar PVReady to buildDeveloper sale

Capacity

299 MW

COD target

2027/28 (CfD delivery year)

Pricing

On enquiry

One form — we email the desk and confirm to you.

UK AR6 solar CfD winner. Contracted 299 MW (of a larger consented scheme reported at 420 MW by trade press). Delivery year 2027/28. Public auction result — a construction-finance / CfD offtake file, not an EnergyInfra listing.

Location. Hertfordshire, England (AR6 region England; OS grid TL752134 on the award list).

Grid. Not disclosed in the public source.

Connection. UK CfD Allocation Round 6 award. Applicant: LONGFIELD SOLAR ENERGY FARM LIMITED. Contracted capacity 299.00 MW, strike £50.07/MWh (2012 prices), delivery year 2027/28, Pot 1. Nationally consented solar. Asking price not published.

Offtake. Contracts for Difference, AR6, strike £50.07/MWh (2012 prices).

Public source. UK Government, CfD Allocation Round 6 results. Compiled from a public announcement or listing — not an EnergyInfra-owned asset and not a CIM. https://www.gov.uk/government/publications/contracts-for-difference-cfd-allocation-round-6-results/contracts-for-difference-cfd-allocation-round-6-results-accessible-webpage

Request this file

Further grid, offtake and VDR detail is for registered investors. A short application is enough to start. Full KYC is asked when you request this file; the desk grants rooms per asset after review.